Hammar initial production facilities (IPF)

  

This is a 200K Barrels of Oil per Day (BOPD) upstream oil production facility to process raw crude to BS&W spec. Located about 50 kms away Basra, Southern Iraq, this site doesn't have access to the electric grid of the country.


Our Team members have played key roles in design and procurement the electrical power generation and distribution system of the facility to enable black-start up the facility and reach 100% production smoothly. The system comprises of 4x10MW gas turbines generators for main power and 4x1MW diesel generators for black-start up and emergency power. Commissioning and Startup of this upstream facility successfully on time is highly critical for all stakeholders involved. Our team members have been on site and collaborated with testing and commissioning teams to support the EPC contractor demonstrate the performance for the 72hr testing period.